Lifting equipment scope

Explore our lifting equipment categories and the equipment families behind them.

Overhead crane in an industrial workshop
LME 054 · EQUIPMENT SCOPE

Inspection & testing categories

Explore the equipment named on our LME certificate, alongside our container crane, straddle carrier and boat-lift services. Use these examples to identify your equipment and discuss the inspection with our team.

DMR 18 · SOUTH AFRICAN REQUIREMENTS

Know when to inspect.
Know when to test.

The cards below summarise the maximum examination and testing intervals where South Africa’s Driven Machinery Regulations apply. LMI means Lifting Machinery Inspector; LME means Lifting Machinery Entity.

Before use & re-erection

DMR 18(5)(a) requires thorough examination and a performance test before use, each time the machine is dismantled and re-erected, and thereafter within 12 months. The LMI of the LME must have knowledge of that machine type.

Redeployment exceptions

Under 18(5)(c), mobile cranes, self-erecting cranes and mobile elevated work platforms are exempt from a performance test after each redeployment within that 12-month period. This does not remove their periodic examination and testing duties.

Test method & records

Use the performance test prescribed by the manufacturing standard. The 110% safe-working-load fallback applies only where the manufacturing or incorporated standard is absent. Keep the register required by 18(7); leased equipment has additional record requirements.

These are maximum intervals, not permission to keep using defective equipment. Marine, mining and cross-border work may fall under additional or different legislation. Read DMR 18 in the official regulations ↗

Illustrative lifting tackle
LME 054 · EQUIPMENT CATEGORY

Lifting tackle

Lifting tackle inspection

15 equipment subcategories
  • Steel wire rope slings
  • Alloy chain slings
  • Webbing slings
  • Eye and clevis hooks
  • Snatch blocks
  • Mechanical coupling links
  • Shackles
  • Clamps / wire rope clamps
  • Lifting points / rings
  • Lifting beams
  • Spreader beams
  • Plate grabs
  • Balance fork attachments
  • Coil grabs
  • Bar tongs

DMR 18 · inspection & testing

  • Within 3 months: examination by a competent person appointed in writing by the user; results recorded and signed. 18(10)(e)
  • Unsafe tackle: inspect and discard items with damage, defects, wear or distortion that make them unsafe. 18(10)(d)
  • Testing: lifting tackle is excluded from the annual machine performance-test provision; follow the applicable product standard. 18(5)(a)
Before-use duties & exceptions ↗
Illustrative lever hoists
LME 054 · EQUIPMENT CATEGORY

Lever hoists

Inspection & applicable load testing

  • Lever-operated chain hoists

DMR 18 · inspection & testing

  • Within 12 months: thorough examination and performance test by an LMI of an LME. 18(5)
  • Within 6 months: competent-person examination of integral ropes, chains, hooks, sheaves, brakes and safety devices. 18(6)
  • Keep a register: record tests, examinations, modifications and repairs on the user’s premises. 18(7)
Before-use duties & exceptions ↗
Illustrative chain blocks
LME 054 · EQUIPMENT CATEGORY

Chain blocks

Inspection & applicable load testing

  • Hand-operated chain blocks

DMR 18 · inspection & testing

  • Within 12 months: thorough examination and performance test by an LMI of an LME. 18(5)
  • Within 6 months: competent-person examination of integral ropes, chains, hooks, sheaves, brakes and safety devices. 18(6)
  • Keep a register: record tests, examinations, modifications and repairs on the user’s premises. 18(7)
Before-use duties & exceptions ↗
Reference-based illustration of Overhead cranes
LME 054 · EQUIPMENT CATEGORY

Overhead cranes

Inspection & applicable load testing

4 equipment subcategories
  • Overhead bridge cranes
  • Gantry cranes
  • Rail-mounted cranes
  • Goliath cranes

DMR 18 · inspection & testing

  • Within 12 months: thorough examination and performance test by an LMI of an LME. 18(5)
  • Within 6 months: competent-person examination of integral ropes, chains, hooks, sheaves, brakes and safety devices. 18(6)
  • Keep a register: record tests, examinations, modifications and repairs on the user’s premises. 18(7)
Before-use duties & exceptions ↗
Illustrative tower cranes
LME 054 · EQUIPMENT CATEGORY

Tower cranes

Inspection & applicable load testing

  • Top-slewing tower cranes
  • Bottom-slewing tower cranes

DMR 18 · inspection & testing

  • Within 12 months: thorough examination and performance test by an LMI of an LME. 18(5)
  • Within 6 months: competent-person examination of integral ropes, chains, hooks, sheaves, brakes and safety devices. 18(6)
  • Keep a register: record tests, examinations, modifications and repairs on the user’s premises. 18(7)
Before-use duties & exceptions ↗
Reference-based illustration of Forklifts
LME 054 · EQUIPMENT CATEGORY

Forklifts

Inspection & applicable load testing

10 equipment subcategories
  • Counterbalance forklifts
  • Side loaders
  • Rail / tyre stacker and reach trucks
  • Pedestrian-controlled lift trucks
  • Order-picking lift trucks
  • Pallet trucks
  • Telehandlers
  • Rough-terrain forklifts
  • Large lift trucks
  • Truck-mounted forklifts

DMR 18 · inspection & testing

  • Within 12 months: thorough examination and performance test by an LMI of an LME. 18(5)
  • Within 6 months: competent-person examination of integral ropes, chains, hooks, sheaves, brakes and safety devices. 18(6)
  • Keep a register: record tests, examinations, modifications and repairs on the user’s premises. 18(7)
Before-use duties & exceptions ↗
Illustrative mobile cranes
LME 054 · EQUIPMENT CATEGORY

Mobile cranes

Inspection & applicable load testing

9 equipment subcategories
  • Truck-mounted cranes
  • Fixed / truck-mounted knuckle-boom loader cranes
  • Pick-and-carry cranes
  • Mobile harbour cranes
  • Lattice-boom crawler cranes
  • Lattice-boom cranes on wheeled carriers
  • Rough-terrain / centre-mounted cranes
  • All-terrain cranes
  • Carry-deck cranes

DMR 18 · inspection & testing

  • Within 12 months: thorough examination and performance test by an LMI of an LME. 18(5)
  • Within 6 months: competent-person examination of integral ropes, chains, hooks, sheaves, brakes and safety devices. 18(6)
  • Keep a register: record tests, examinations, modifications and repairs on the user’s premises. 18(7)
Before-use duties & exceptions ↗
Illustrative reach stackers
LME 054 · EQUIPMENT CATEGORY

Reach stackers

Inspection & applicable load testing

  • Container reach stackers
  • Manual / automatic spreader configurations

DMR 18 · inspection & testing

  • Within 12 months: thorough examination and performance test by an LMI of an LME. 18(5)
  • Within 6 months: competent-person examination of integral ropes, chains, hooks, sheaves, brakes and safety devices. 18(6)
  • Keep a register: record tests, examinations, modifications and repairs on the user’s premises. 18(7)
Before-use duties & exceptions ↗
Illustrative tail lifts
LME 054 · EQUIPMENT CATEGORY

Tail lifts

Inspection & applicable load testing

  • Vehicle-mounted tail lifts

DMR 18 · inspection & testing

  • Within 12 months: thorough examination and performance test by an LMI of an LME. 18(5)
  • Within 6 months: competent-person examination of integral ropes, chains, hooks, sheaves, brakes and safety devices. 18(6)
  • Keep a register: record tests, examinations, modifications and repairs on the user’s premises. 18(7)
Before-use duties & exceptions ↗
Illustrative crawler cranes
LME 054 · EQUIPMENT CATEGORY

Crawler cranes

Inspection & applicable load testing

  • Lattice-boom crawler cranes

DMR 18 · inspection & testing

  • Within 12 months: thorough examination and performance test by an LMI of an LME. 18(5)
  • Within 6 months: competent-person examination of integral ropes, chains, hooks, sheaves, brakes and safety devices. 18(6)
  • Keep a register: record tests, examinations, modifications and repairs on the user’s premises. 18(7)
Before-use duties & exceptions ↗
Illustrative jib cranes
LME 054 · EQUIPMENT CATEGORY

Jib cranes

Inspection & applicable load testing

  • Freestanding jib cranes
  • Permanently attached jib cranes

DMR 18 · inspection & testing

  • Within 12 months: thorough examination and performance test by an LMI of an LME. 18(5)
  • Within 6 months: competent-person examination of integral ropes, chains, hooks, sheaves, brakes and safety devices. 18(6)
  • Keep a register: record tests, examinations, modifications and repairs on the user’s premises. 18(7)
Before-use duties & exceptions ↗
Illustrative electric chain hoists
LME 054 · EQUIPMENT CATEGORY

Electric chain hoists

Inspection & applicable load testing

  • Powered chain-hoist systems

DMR 18 · inspection & testing

  • Within 12 months: thorough examination and performance test by an LMI of an LME. 18(5)
  • Within 6 months: competent-person examination of integral ropes, chains, hooks, sheaves, brakes and safety devices. 18(6)
  • Keep a register: record tests, examinations, modifications and repairs on the user’s premises. 18(7)
Before-use duties & exceptions ↗
Reference-based illustration of Truck mounted cranes
LME 054 · EQUIPMENT CATEGORY

Truck mounted cranes

Inspection & applicable load testing

  • Truck-mounted cranes
  • Fixed / truck-mounted knuckle-boom loader cranes

DMR 18 · inspection & testing

  • Within 12 months: thorough examination and performance test by an LMI of an LME. 18(5)
  • Within 6 months: competent-person examination of integral ropes, chains, hooks, sheaves, brakes and safety devices. 18(6)
  • Keep a register: record tests, examinations, modifications and repairs on the user’s premises. 18(7)
Before-use duties & exceptions ↗
Illustrative mobile elevated work platform
LME 054 · EQUIPMENT CATEGORY

Mobile elevated work platform

Inspection & applicable load testing

  • Boom platforms / cherry pickers
  • Special insulated aerial platforms
  • Mobile / fixed scissor lifts

DMR 18 · inspection & testing

  • Within 12 months: thorough examination and performance test by an LMI of an LME. 18(5)
  • Within 6 months: competent-person examination of integral ropes, chains, hooks, sheaves, brakes and safety devices. 18(6)
  • Keep a register: record tests, examinations, modifications and repairs on the user’s premises. 18(7)
Before-use duties & exceptions ↗
Illustrative ship to shore cranes
LME 054 · EQUIPMENT CATEGORY

Ship to shore cranes

Inspection & applicable load testing

  • Dockside rail-mounted container gantry cranes

DMR 18 · inspection & testing

  • Within 12 months: thorough examination and performance test by an LMI of an LME. 18(5)
  • Within 6 months: competent-person examination of integral ropes, chains, hooks, sheaves, brakes and safety devices. 18(6)
  • Keep a register: record tests, examinations, modifications and repairs on the user’s premises. 18(7)
Before-use duties & exceptions ↗
Reference-based illustration of Wharf side cranes
LME 054 · EQUIPMENT CATEGORY

Wharf side cranes

Inspection & applicable load testing

  • Rail-travelling wharf cranes

DMR 18 · inspection & testing

  • Within 12 months: thorough examination and performance test by an LMI of an LME. 18(5)
  • Within 6 months: competent-person examination of integral ropes, chains, hooks, sheaves, brakes and safety devices. 18(6)
  • Keep a register: record tests, examinations, modifications and repairs on the user’s premises. 18(7)
Before-use duties & exceptions ↗
Reference-based illustration of Hi-Lo unloader testing at a sugar mill
LME 054 · EQUIPMENT CATEGORY

Hi-Lo cranes and sugar cane unloaders

Inspection & applicable load testing

  • Hi-Lo sugar cane unloaders
  • Sugar cane loading cranes

DMR 18 · inspection & testing

  • Within 12 months: thorough examination and performance test by an LMI of an LME. 18(5)
  • Within 6 months: competent-person examination of integral ropes, chains, hooks, sheaves, brakes and safety devices. 18(6)
  • Keep a register: record tests, examinations, modifications and repairs on the user’s premises. 18(7)
Before-use duties & exceptions ↗
Illustration of a reach stacker and straddle carrier testing cradles of stacked 10-tonne solid weights, with an RTG in the background
PORT EQUIPMENT CATEGORY

Container cranes

Inspection & applicable load testing

  • Rubber-tyred gantry container cranes (RTG)
  • Rail-mounted container gantry cranes
  • Container spreaders and test frames

DMR 18 · inspection & testing

  • Within 12 months: thorough examination and performance test by an LMI of an LME. 18(5)
  • Within 6 months: competent-person examination of integral ropes, chains, hooks, sheaves, brakes and safety devices. 18(6)
  • Keep a register: record tests, examinations, modifications and repairs on the user’s premises. 18(7)
Before-use duties & exceptions ↗
Illustrative straddle carriers
PORT EQUIPMENT CATEGORY

Straddle carriers

Inspection & applicable load testing

  • Container straddle carriers

DMR 18 · inspection & testing

  • Within 12 months: thorough examination and performance test by an LMI of an LME. 18(5)
  • Within 6 months: competent-person examination of integral ropes, chains, hooks, sheaves, brakes and safety devices. 18(6)
  • Keep a register: record tests, examinations, modifications and repairs on the user’s premises. 18(7)
Before-use duties & exceptions ↗
Illustration of a marine travel lift with WWLTS test beams, reeved wire ropes and 55T-capacity water bags
MARINE EQUIPMENT CATEGORY

Boat lifts

Inspection & applicable load testing

  • Mobile boat hoists and marine travel lifts
  • Multi-point water-bag load testing
  • Hoist ropes, sheaves and lifting assemblies

Marine lifting · inspection & testing

  • Planned around the lift: confirm the hoist arrangement, test points and applicable requirements.
  • Controlled loading: water bags, load cells and rigging selected for the agreed test.
  • Documented findings: equipment condition, test results and inspection records.
Discuss your boat lift ↗

The 17 LME-labelled categories follow the supplied LME 054 certificate. Container cranes, straddle carriers and boat lifts are shown as additional service categories. Confirm the exact machine and inspector scope when planning work.