Plan testing around terminal equipment and operations
Ship-to-shore and mobile harbour cranes have different working arrangements and access needs. WWLTS helps bring the equipment details, loading plan and terminal programme together so the work can be scoped before mobilisation.
Port equipment operates within a wider logistics system. Test planning needs to consider the asset configuration, working area, access and available operational window. WWLTS helps establish the appropriate equipment and inspection scope for the project.
WHAT WE DO
A closer look at the work
The work is scoped around your equipment, site and required outcomes.
01
Identify the crane configuration
Manufacturer, model, rated capacity information and the intended test arrangement are the starting point. Share relevant drawings and attachment details, including any spreader or lifting arrangement involved in the scope.
02
Coordinate equipment and access
The working area, delivery route and available clearance influence the test equipment selected. Terminal permissions, water arrangements and the people responsible for site coordination should be established in advance.
03
Fit the terminal programme
Operational windows and vessel movements can affect access to the asset. We discuss timing, inspection requirements and reporting with your team so the quotation reflects the practical conditions of the job.
WHAT YOU RECEIVE
Clear findings. A practical next step.
Inspection and testing records for the agreed port-crane configuration, with findings available to the responsible engineering and maintenance teams.
Tell us how your team uses its equipment records and which documents the project requires. We agree the reporting scope before the work starts.
Share the crane manufacturer, model and configuration with the terminal location and available window. Discuss working space, access permissions and equipment delivery with the site team.
02
Prepare the port-crane test
The loading arrangement and measurement equipment are matched to the agreed asset scope. Examination, loading and site coordination follow the programme confirmed with the terminal.
03
Record the terminal equipment findings
Review the inspection and testing documentation for the identified port crane. The engineering team can use the findings alongside its existing maintenance and equipment records.
TEST-LOAD SELECTION
Choose around the equipment and site
Water bags or solid weights may suit this crane, subject to the configuration and agreed method. Water bags travel empty and allow staged filling; solid weights avoid reliance on water supply and drainage.
Crane manufacturer, model, capacity and configuration
Terminal location and available working window
Relevant drawings, previous reports and project requirements
Include a contact person and tell us about any access restrictions or deadlines.
BEFORE YOU ENQUIRE
Your questions, answered
Do you cover both STS and mobile harbour cranes?
These are among the port applications described in our service scope. Send the specific model, location and configuration so the team can confirm the inspection and testing arrangement for your project.
What happens after I request a quote?
The team reviews your equipment and site information, clarifies any missing details and confirms the proposed scope, availability and pricing. Sending an enquiry does not book a test or confirm an appointment.
WWLTS proof load testing of two 440-tonne ship deck cranes using water-filled test bags at Dormac Yard, Durban Port. The company video description reports completion in under 12 hours.