Two 440-tonne cranes.
One Durban project.

WWLTS load testing at Dormac Yard, Durban Port, South Africa.

Marine load testing at a shipyard
MARINE LOAD TESTING · SOUTH AFRICA

WWLTS at work.
Dormac Yard.

This WWLTS project video documents load testing of two 440-tonne ship deck cranes. The project took place at Dormac Yard in Durban Port. The video description reports that the team completed both cranes in under 12 hours using water-filled proof load bags. The 440-tonne figure describes each crane’s stated capacity; it is not a statement of the applied test load.

Equipment

Two ship deck cranes, each described as 440 tonnes in the original video title.

Discuss a similar project

Send the crane details, rated capacity, site location and planned dates to our team.